- Mix designed to project design parameters and performance requirements for any project.
- Typically 24N/mm² at 24 hours
- Typically 70-80N/mm² at 28 days (minimum 60N/mm²)
- Rapid surface dry for early application of applied flooring systems (<75%rh at 7 – 14 days)
- Three-fold increase in life span
Placing & Finishing: Breedon Titan is typically laid in excess of 100mm in depth and can be placed using a conventional skip, pump or direct placement methods. Full compaction will be achieved by the correct application of standard vibrating equipment. The use of a curing membrane is essential.
This concrete has an exceptionally low bleed rate tendency. The surface of the concrete must be protected against moisture loss during casting. Excessive drying rates should be avoided within the first 24 hours and curing should begin immediately after the concrete has been placed and finished.